# Distance from Mumbai (BOM) to Corryong Airport (CYG)

> 9,981 km · estimated flight time 13h · Ultra-long-haul route.

## Summary

- **Distance**: 9,981 km / 6,202 mi / 5,390 nm
- **Estimated flight time**: 13h
- **Heading**: 129° (southeast)
- **Return heading**: 294° (west northwest)
- **Classification**: Ultra-long-haul
- **Type**: International (India) → Australia
- **Intercontinental**: Asia → Oceania
- **Time difference**: +4.5h (When it's 08:43 in Mumbai, it's 13:13 in Corryong Airport)
- **Elevation difference**: 926 ft (CYG is higher than BOM)

## Airports

### [Chhatrapati Shivaji International Airport (BOM)](https://www.flightduration.online/airport/bom-mumbai-chhatrapati-shivaji-international-airport/1ef266df-eed6-6a1a-9d01-06bb2780ed98)

- City: Mumbai, India
- ICAO: VABB
- Timezone: Asia/Kolkata
- Coordinates: 19.090000, 72.870000
- Elevation: 37 ft

### [Corryong Airport (CYG)](https://www.flightduration.online/airport/cyg-corryong-airport/1ef266e0-095e-6392-8ff9-06bb2780ed98)

- City: Corryong Airport, Australia
- ICAO: YCRG
- Timezone: Australia/Melbourne
- Coordinates: -36.180000, 147.890000
- Elevation: 963 ft

## Route notes

This is an ultra-long-haul route, one of the longest in aviation. It requires wide-body aircraft with extended range capability such as the Airbus A350-900ULR or Boeing 777-200LR. Passengers should prepare for an extended flight with multiple meal services.

Time-zone information: When it's 08:43 in Mumbai, it's 13:13 in Corryong Airport.
The 4.5-hour time difference may cause some jet lag.

## Related

- [Chhatrapati Shivaji International Airport (BOM)](https://www.flightduration.online/airport/bom-mumbai-chhatrapati-shivaji-international-airport/1ef266df-eed6-6a1a-9d01-06bb2780ed98)
- [Corryong Airport (CYG)](https://www.flightduration.online/airport/cyg-corryong-airport/1ef266e0-095e-6392-8ff9-06bb2780ed98)
- [Flight duration calculator](/#calculator)