# Distance from Mumbai (BOM) to Gold Beach (GOL)

> 12,949 km · estimated flight time 16h · Ultra-long-haul route.

## Summary

- **Distance**: 12,949 km / 8,046 mi / 6,992 nm
- **Estimated flight time**: 16h
- **Heading**: 14° (north northeast)
- **Return heading**: 342° (north northwest)
- **Classification**: Ultra-long-haul
- **Type**: International (India) → United States
- **Intercontinental**: Asia → North America
- **Time difference**: -12.5h (When it's 18:20 in Mumbai, it's 05:50 in Gold Beach)
- **Elevation difference**: 17 ft (GOL is lower than BOM)

## Airports

### [Chhatrapati Shivaji International Airport (BOM)](https://www.flightduration.online/airport/bom-mumbai-chhatrapati-shivaji-international-airport/1ef266df-eed6-6a1a-9d01-06bb2780ed98)

- City: Mumbai, India
- ICAO: VABB
- Timezone: Asia/Kolkata
- Coordinates: 19.090000, 72.870000
- Elevation: 37 ft

### [Gold Beach Municipal Airport (GOL)](https://www.flightduration.online/airport/gol-gold-beach-gold-beach-municipal-airport/1ef266df-01fe-6684-ba81-06bb2780ed98)

- City: Gold Beach, United States
- ICAO: K4S1
- Timezone: America/Los_Angeles
- Coordinates: 42.420000, -124.420000
- Elevation: 21 ft

## Route notes

This is an ultra-long-haul route, one of the longest in aviation. It requires wide-body aircraft with extended range capability such as the Airbus A350-900ULR or Boeing 777-200LR. Passengers should prepare for an extended flight with multiple meal services.

Time-zone information: When it's 18:20 in Mumbai, it's 05:50 in Gold Beach.
With a 12.5-hour time difference, expect significant jet lag.

## Related

- [Chhatrapati Shivaji International Airport (BOM)](https://www.flightduration.online/airport/bom-mumbai-chhatrapati-shivaji-international-airport/1ef266df-eed6-6a1a-9d01-06bb2780ed98)
- [Gold Beach Municipal Airport (GOL)](https://www.flightduration.online/airport/gol-gold-beach-gold-beach-municipal-airport/1ef266df-01fe-6684-ba81-06bb2780ed98)
- [Flight duration calculator](/#calculator)